Midtown Park Phase 8A


(click image to view larger)

Constructed a 339 space parking lot with 7" concrete pavement, providing ample parking capacity. Installed concrete curbing with brick pavers around the parking lot, adding aesthetic appeal and structural integrity. Poured 8" concrete pavement, including a decleration lane, to accommodate traffic flow and enhance safety. Installed Class III Reinforced Concrete Pipe (RCP) storm drains with structural backfill, ensuring effective drainage and compliance with ASTM C 76 standards.