Navasota Street Maintenance 2025


(click image to view larger)

The 2025 City of Navasota’s Street Maintenance Project consisted of executing a full-depth roadway rehabilitation in to enhance safety and longevity. Our team carefully managed traffic control setup ensuring safe work zones, along with the freshly prepared subgrade that was graded and compacted to support 6 inches of cement stabilization. Over this stable base, 2 inches of HMAC Type D (fine surface mix) was placed with prime coat, tack coat, and thorough compaction to deliver a smooth, durable driving surface. Along the pavement edge, crushed limestone base was installed and compacted for shoulder dressing, improving drainage, edge support, and overall roadway appearance.