During this muliple phase project, we made sure our traffic control was perfect as this area was still occupied with pedestrians. We reconstructed 87,000 square feet of concrete pavement on Gene Stallings Blvd and Joe Routt Blvd across from Kyle Field. Our team did some very detailed work by installing herringbone, running bond, and stacked bond pattern clay and concrete brick pavers around the medians along with adding them to the exterior front entrance of the building. We formed and poured sidewalks with ADA ramps as well as adding new concrete bollards. Our team restriped the new reconstructed street with designated areas for pedestrian crossing, medians, bike lane, and turn lanes.
|